- Cleaned inside and outside
- Painted inside and outside
- Refurbished and painted plastic knobs
- Replaced vibrator with solid state version
- Gutted rectifier tube and installed 1N4007 diodes
- Replaced all tubes
- Replaced all paper capacitors
- Re-canned electrolytic capacitors
- Replaced first IF transformer
- Replaced and re-stung dialcord
- Cleaned and lubed tuning mechanics
- replaced volume/tone control
- Repainted dial lettering
- Replaced interconnecting wiring
- Complete alignment
- Replaced all labels
- Straightened all sheet metal
- Added tube retaining foam
Sunday, January 12, 2014
Radio Completed
Here is a list of what I did:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment